Terms and conditions

[vc_row row_content_width=”grid” css=”.vc_custom_1600703093557{padding-top: 60px !important;}”][vc_column offset=”vc_col-xs-12″][eltdf_section_title type=”standard” position=”” separator=”yes” title_tag=”h3″ disable_break_words=”no” separator-color=”#8e4896″ title=”General Terms and Conditions for Professional and Business Training and Education”][/vc_column][/vc_row][vc_row row_content_width=”grid” css=”.vc_custom_1605092076252{padding-top: 20px !important;padding-bottom: 80px !important;}”][vc_column][vc_column_text css_animation=”none”]1. IDcentre B.V. Terms and Conditions
“These General Terms and Conditions were established between the industry association and the Consumers’ Association (Consumentenbond) (and potentially other consumer organizations).

Within the framework of the Self-Regulation Coordination Group (CZ) of the Social and Economic Council (SER) and shall enter into force as of October 2014.”

IDcentre B.V. is not a member of the aforementioned industry association but has registered separately with the Private Educational Institutions Disputes Committee of the Foundation for Consumer Complaints Boards (see the website of De Geschillencommissie). Within the framework of that registration, binding agreements have been made with the SGC regarding compliance with the committee’s rulings.

1. Definitions
Education: Education, training, course, and/or instruction, including both distance learning and classroom-based learning.
Contractor: IDcentre B.V.
Client: Enterprise, regardless of its legal form, that procures an educational service from the contractor.

2. General
The contractor applying these terms is not a member of the Dutch Council for Training and Education (NRTO). However, the NRTO general terms and conditions apply to all offers, activities, quotes, and agreements for training and education between the contractor and clients, or their legal successors, respectively.

3. Rules of Conduct
All business assignments regarding training and education are carried out in compliance with the NRTO code of conduct for profession and business. This code of conduct can be requested from the NRTO secretariat.
The client and the contractor can thus form a picture of the issue, the scope of the project, and its potential results. Should this lead to a preliminary investigation, the conditions of this investigation will be agreed upon with the client in advance.

4. Assignment in Conflict with the Code of Conduct
The contractor will refuse an assignment or cease further execution of the assignment if doing so would result in a conflict with the NRTO code of conduct for profession and business.

5. Acceptance of Assignment
The contractor only accepts assignments for which they possess the necessary qualifications.
The contractor’s employees to be deployed for an assignment must be able to work on that assignment effectively through their knowledge, experience, and personal qualities.
Both clients and the contractor may, in consultation, request employees other than those initially charged with the execution of the assignment, provided this does not compromise quality and continuity.

The contractor must create such conditions that all persons at the client’s organization who are required to cooperate in the execution clearly understand what that cooperation entails.

6. Formation of the Assignment
The assignment is accepted provided there is full mutual agreement between the parties regarding the content and the conditions of execution.

Mutual agreement regarding the content of the assignment is established by the contractor collecting the necessary information in sufficient detail on the one hand, and the client providing all essential information for the setup and execution of the assignment to the best of their knowledge on the other.

7. Execution Conditions
In the mutual agreement regarding the execution conditions, agreements can be made concerning:

• determination of the target group;
• conditions for participation, such as voluntary participation;
• determination of learning needs;
• the training subject to be used;
• the method of working;
• the materials and/or technical aids to be used;
• the reality value regarding training expectations;
• the choice of trainers to be deployed by the contractor and the client, and the appointment of a possible project leader;
• the role of the trainer(s);
• an indication of the duration of the training and any phasing;
• the manner in which the training will be evaluated;
• any debriefing;
• the cost estimate;
• costs of training materials;
• travel and accommodation costs of the trainer;
• additional costs for training outside of usual working days;
• costs for accommodation and facilities such as refreshments etc., and the division of tasks for organizing them;
• the charging of quotation costs;
• payment and cancellation arrangements;
• provisions regarding force majeure situations;
• ownership and intellectual property rights including copyright;
• the desired or necessary aftercare.

The aforementioned list is not exhaustive. Matters not mentioned but in line with this subject can, of course, be arranged by the client and the contractor in consultation.

8. Amendments to the Assignment
If facts or circumstances occur during the execution of the assignment that (would) detract from the original mutual agreement reached, timely consultation will take place between the client and the contractor to adapt the agreements to the changed situation.

9. Interim Termination of the Assignment (Force Majeure)
The contractor has the right to withdraw from an assignment if, due to changes beyond their control, proper execution of the assignment is hindered.
Should the client proceed to premature termination, the contractor is entitled to compensation in connection with demonstrable loss of occupancy.

10. Cooling-off Period
After signing the assignment/registration, a cooling-off period of 14 days applies, during which the assignment can be cancelled free of charge. This applies to both private and business customers.

11. Involving Third Parties in the Assignment
The involvement or engagement of third parties in the execution of the assignment by the client or by the contractor shall take place exclusively by mutual agreement.

12. Progress Reporting
The contractor will keep the client informed of the progress of their work.
In doing so, the contractor shall, upon request, provide insight into the methods applied in the various phases of the training process.

13. Documentation of the Assignment
The contractor maintains documentation of the assignments they have executed in a manner of their choosing, partly with a view to potential subsequent accountability.

The contractor ensures that archive documents cannot be misused.

14. Confidentiality
The contractor shall exercise the care that can reasonably be requested regarding the use of information provided to them or brought to their attention within the assignment relationship.

In general, information that is of a confidential nature or whose confidential nature should be understood will only be used if the interest of the assignment’s execution requires it. When passing on such information, care will be taken to ensure it cannot be traced back to the source if this could have adverse consequences for them. Data obtained in confidence from the client’s employees will only be passed on to others if the use thereof has been made known to the information provider in a timely manner and they have indicated they have no objection.

15. Assignment Evaluation
The execution of assignments regarding training and education may be subject to random assignment evaluation by the contractor or an independent external institute.
The latter is done by sending the assignment evaluation form with the request to return it completed to the monitoring institute, or through a telephone survey.

16. Remuneration
The contractor will charge a fee that is in accordance with the services rendered and the responsibilities accepted.

17. Hiring of Mutual Personnel
Parties shall not hire each other’s personnel or negotiate employment during the duration of the assignment (execution), other than in consultation.

18. Intellectual Property
Modules, models, techniques, instruments, including software, used for the execution of the assignment, are and remain the property of the contractor, unless otherwise agreed.
Disclosure can therefore only take place after obtaining permission from the contractor.

The client naturally has the right to reproduce documents for use within their own organization, insofar as it fits within the purpose of the assignment. In the event of interim termination of the assignment, the foregoing applies mutatis mutandis.

19. Complaints Procedure
IDcentre B.V. must adhere to the NRTO code of conduct for profession and business (https://www.nrto.nl/kwaliteit/algmene-voorwaarden/). Compliance with these general terms and conditions as well as the code of conduct is promoted by the NRTO, in that complaints are investigated and, if violations are found, measures are taken.
If the client is of the opinion that IDcentre B.V. does not comply with the aforementioned NRTO rules, the client can submit this complaint to the Quality Enforcement Committee, whereby the applicable procedural rules apply. The client can address a complaint in writing to this committee. [/vc_column_text][/vc_column][/vc_row]